JOB LOCATION
Phoenix, Bullhead City, Kingman Arizona.
JOB DESCRIPTION
We have unlimited amount of FTTH work. We also do work as a prime for several catv, fiber and power companies (see details below).
FTTH- We are the prime. $35 per foot plus solid rock $30 additionally if we encounter.
Drill and set boxes. We will handle the fiber.
Additional line items and pricing.
We will provide the water, dump site and yard space.
We handle the white lines and 811’s.
We provide pea gravel for backfill.
This project will be one or two 2”.
We will provide all traffic control above typical sign and cones.
We take care of the hard surface restoration.
Minimum depth 24”.
6 days a week all day.
**Sandstone, sand, cobble, possibly some caliche and some dirt here and there**
FTTH- We are the prime. $10.50 per foot for drilling or missile crews, includes small HH’s. Installing four 3/4″ pipes or four micro ducts. Two will run HH to HH and two will sweep in and out of the 11″x11″ flower pots. HH sizes are 13″x24″. Minimum depth, 27″.
We handle any traffic control, hard surface restoration, water needs and dump site.
7 days a week work available and the city is allowing most work hours to be 6am-7pm M-S and 7am-6pm on Sunday.
We will have a yard to park equipment over nights at no additional cost.
CATV- We have two customers. We have maint projects, 150-2,000′ in length. Many of these pay approx $25.00 all in per foot.
Fiber long haul- We have several projects under construction that vary from $15-23 all in per foot.
Primary/secondary- We have power work where it pays $30 plus per foot depending on SOW.
Payment terms: 30 days, 14 days, or 7 day pay for different % as a fee. ACH direct deposit.
Insurance requirements: Typical industry standards.
Please contact us if interested. Contact info below.
CONTACT
Phoenix Office: 602-633-9525
Hank Doss: 480-740-9022 h.doss@hmw-construction.com
Joe Ward 402-212-0368 j.ward@hmw-construction.com